Before the power peak at UC TATI
How a campus energy project could give facilities staff time to act while electricity demand is still rising.
What could a campus facilities team do with a little warning before an electricity peak? It might delay a scheduled laundry run, stagger when air conditioning starts, or ask a workshop to move a discretionary equipment run. Each change sounds small. The timing is what makes it matter.
At UC TATI, imagine classes winding down just as students return to their hostels. Cooling is still running in parts of the academic block, and the evening routine is getting under way. Each building is operating as expected. When their electrical loads overlap, campus demand can climb. Once the peak has passed, staff can investigate it. With an early warning, they can also decide whether anything can safely wait.
See which buildings contribute to a campus peak
UC TATI has already demonstrated real-time maximum demand monitoring at a single electrical intake. The proposed next step would bring the academic block, administration building and student hostels into one FAVORIOT dashboard.
Building intake meters would stream electrical readings, including demand and energy consumption. Staff could compare the buildings over the same interval to see which ones were drawing power when campus demand rose. Equipment schedules and control logs could then help explain what was running inside those buildings.
Forecast the rise and give staff a choice
As UC TATI builds its own history of electricity use, the project would test forecasts that combine recent demand readings with campus timetables and occupancy patterns. If projected demand approaches a threshold set by the facilities team, FAVORIOT could send an alert showing when the rise is expected, which buildings are contributing and what staff can check.
Example alert
Campus demand is expected to rise this evening. The hostels account for most of the forecast increase. Check whether the next scheduled laundry run can start later.
The pilot would start with staff-approved changes. The facilities team could agree in advance which equipment can wait, who can approve a change and when each load must return to service. The options might include:
- Stagger air-conditioning starts across zones before teaching begins, while keeping occupied rooms comfortable.
- Reschedule discretionary equipment runs around teaching and hostel routines.
- Coordinate start times across buildings so large loads come on at different times.
- Restart deferred loads in stages and watch the demand trend as each one comes back.
Recording the alert, the action taken and the subsequent meter readings would give staff a record to review. If the same pattern keeps appearing, the team could change the recurring schedule and see whether the peak eases over time.
Connect • See • Act™
Connect
Bring building meter readings together in FAVORIOT.
See
Forecast a rise in demand and see where it is coming from.
Act
Shift an approved load and review what the meters recorded.
For us at FAVORIOT, the practical test is whether the team can make a timely change while classes, hostel life and campus services carry on as usual. That is what the proposed pilot would set out to learn.